July 30, 2026 · Presenter: Jeans Huang
Hi everyone, thanks for joining. This is our fifth bi-weekly sync. Today we have two items on the agenda.
First, Batch 1 goes live tomorrow, July 31st — we'll talk about how we're rolling it out and how to give feedback. Second, Batch 2 acceptance criteria are ready for your review.
Let's get started.
大家好,感谢参会。这是我们第五次双周同步会,今天有两个议题。
第一个是 Batch 1 明天 7月31日正式上线,我们来说一下怎么开放和怎么反馈。第二个是 Batch 2 的验收标准已经准备好了,请大家 review 一下。
我们开始吧。
Two items today. Item one — Batch 1 production release. Item two — Batch 2 acceptance criteria review.
Both are action items, so I'll need your input before we wrap up.
今天两件事:第一件是 Batch 1 上线,第二件是 Batch 2 验收标准 review。
两件事都需要大家的参与和反馈,我在结尾会说明具体的 action。
→ Next slide
Batch 1 goes live tomorrow, July 31st. This is the Smart Diagnostics feature — enter a device SN, and the system automatically identifies faults, outputs a plain-language conclusion, and provides a troubleshooting plan.
A few things to note on the rollout. We are NOT opening this to all users. External users — installers, enterprise customers — will not get access at this stage. We're enabling it account-by-account, for internal designated accounts only. The reason is simple: we want to validate diagnostic accuracy with real production data before any broader rollout.
Your team testing with real devices is the best way to catch gaps in the knowledge base. So we need you to tell us which FleetView accounts you want us to enable. We have a ClickUp task set up for this — just comment your email address there, and we'll get it activated.
Batch 1 明天 7月31日正式上线,也就是智能诊断功能 —— 输入设备 SN,系统自动识别故障,输出人话版的故障结论,提供排查方案。
关于开放方式,有几点要说清楚:我们不对所有用户开放,不对安装商、大客户这些外部用户开放,只向内部指定账号小范围开放。原因很简单,我们需要用生产环境的真实设备数据来验证诊断准确率,发现知识库的盲区,然后再考虑更大范围开放。
所以需要你们告诉我们,哪些 FleetView 账号希望优先开启。我们在 ClickUp 创建了一个任务,直接在下面评论你的账号邮箱就行,我来汇总后找开发开权限。
→ Next slide
Once you have access, here's how to give feedback on the diagnosis results.
Method one — in-app. After the diagnosis is complete, you'll see thumbs up and thumbs down buttons in the bottom-right corner of the result panel. Click thumbs up if it was accurate. Click thumbs down if there was an issue — you can optionally type a description of the problem.
Method two — ClickUp. If you want to share a screenshot, describe a complex issue, or give more detailed feedback, you can comment directly in the ClickUp task. We'll follow up in the thread.
All feedback goes into our backend analytics — we use it directly to improve the knowledge base and diagnostic rules.
开通账号之后,怎么反馈诊断结果?
方式一是 App 内直接反馈。诊断完成后,在结果页右下角可以看到点赞和点踩的按钮。诊断准确就点赞,有问题就点踩,点踩之后可以选填一段问题描述。
方式二是 ClickUp 评论。如果想截图反馈、描述复杂问题,可以直接在 ClickUp 任务里留言,支持截图和文件附件,我们会在里面直接回复跟进。
所有的反馈数据我们在后台都可以看到,会直接用来优化知识库和诊断规则。
→ Next slide
Moving on to Item 2 — Batch 2 acceptance criteria.
Following the same process as Batch 1, we've completed the full acceptance criteria for all 34 Batch 2 requirements. Same format — Layer 1 covers the batch-level definition of done, metrics, and release gates. Layer 2 has Given/When/Then criteria for every single requirement.
Batch 2 has three modules. One-Click Fix and Remote Ops — this is the write-path counterpart to Batch 1's read-only diagnostics. Once you've diagnosed a fault, you can now fix it remotely with one click. That's 4 requirements.
Permission System 2.0 — sub-account management, button-level RBAC, role templates for different types of electricians and supervisors. That's 17 requirements.
And Log Management — log visualization, code-to-English translation, settings change history, and NEM solar export. That's 13 requirements. Target release is September 15th.
I've linked the ClickUp doc on the slide. Please read through and leave comments directly in the document. Once reviewed and approved, we start the design phase and formally kick off Batch 2 development.
接下来是第二件事 —— Batch 2 的验收标准。
跟 Batch 1 一样的流程,我们完成了全部 34 条 Batch 2 需求的验收标准,格式完全一致 —— Layer 1 是批次级的完成定义、度量指标和发布门限,Layer 2 是每条需求的 Given/When/Then。
Batch 2 分三个模块。一键修复与远程操作,这是 Batch 1 只读诊断的写路径延伸,诊断出故障之后可以直接一键远程修复,共 4 条需求。
权限体系 2.0,包括子账号管理、按钮级 RBAC 授权、电工和主管的角色模板,共 17 条需求。
日志管理,包括日志可视化、代码转英文、设置变更历史、NEM 太阳能导出,共 13 条需求。目标发布日期是 9月15日。
文档链接在幻灯片上,请直接在 ClickUp 文档里 review 并留下评论。Review 通过后,我们正式启动设计阶段,Batch 2 就开始了。
→ Next slide
Three action items to close out.
One — request your account access for Batch 1. Comment your FleetView email in the ClickUp task as soon as possible after the July 31st launch. The sooner we get the list, the sooner we can enable access.
Two — review the Batch 2 acceptance criteria and leave comments in the ClickUp doc. Please do this before we start the design phase.
Three — once the AC is approved, we start design and formally kick off Batch 2. Target release remains September 15th.
That's everything for today. Any questions?
最后三件 action。
第一,申请开启 Batch 1 的账号权限。7月31日上线后尽快在 ClickUp 任务里评论你的 FleetView 账号邮箱,越快提交我们越快给你开通。
第二,Review Batch 2 验收标准,在 ClickUp 文档里留下评论。请在设计阶段启动前完成。
第三,验收标准通过后正式启动设计阶段,开始 Batch 2 开发,目标发布日期 9月15日不变。
今天就这些,有问题吗?